30069 LIRB LIRB 05553800 A 9/11/1997 8:00 REACH R downstream of the Starved Rock Lock and Dam "Harris,Mitchell,Adolphson,Debbie,Fazio,D,Stammer,S" Good "Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation " Dredged 1330 Left Right Where the bedrock meets the concrete wall at the park The daymarker located just below the island across from the boat launch 4 "Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation " 9/29/2000 21:39 7/2/2003 12:42